Crystal Cooling installed three Mitsubishi wall-mounted air conditioning systems for Damp Proofing Solutions at their offices in Lower Gornal. The work included the electrical supplies and was completed in under three days.
The customer had a clear preference for the installation: route the pipework onto the flat roof and keep the outdoor units out of sight.
Office heating and cooling
The three wall-mounted systems provide heating and cooling for the offices, giving the business a way to manage indoor temperatures through the seasons. For ongoing care after installation, see our annual maintenance packages.
For this project, the position of the outdoor equipment was an important part of the brief. It needed to be considered alongside the units inside the building.
Keeping the outdoor equipment out of sight
We ran all the pipework up onto the roof and mounted the outdoor units on frames on the flat roof, following the customer’s requested layout.
It’s a useful detail to consider when planning office air conditioning: where will the outdoor equipment sit, and how will the pipework reach it? At these premises, the roof provided the location the customer wanted. You can explore more examples of our work in our recent air conditioning installations.
Completed in under three days
We completed the full installation, including the electrical supplies, in under three days. That timescale covers this particular project; other premises and layouts will involve different work.
Planning air conditioning for your workplace?
If you’re considering air conditioning for offices in Gornal or the surrounding area, we can discuss your requirements and the options for positioning the equipment.
Call or WhatsApp Lee on 07973 131434 to discuss your project and request a quote.















