Crystal Cooling worked with Bickenhill and Marston Green Parish Council on the Marston Green Cricket Club refit, supplying two 10kW Mitsubishi wall-mounted air conditioning units.
The equipment was chosen to provide cooling during the summer and heating through the winter, making temperature control part of the wider refurbishment.
Heating and cooling for the club
Both functions formed part of this project. The units give the club a way to cool the building in warm weather and add heat when temperatures fall.
When air conditioning is being considered during a refit, it’s worth discussing how the building will be used across the year. That conversation helps keep the focus on what the premises need.
Working alongside the refurbishment
We supplied and installed the two wall-mounted units as part of the club’s refit. The parish council was happy with the finished installation.
For another commercial example, our office installation in Gornal shows how a different brief led to outdoor units being positioned on a flat roof.
Looking after the new equipment
Once an installation is in use, servicing becomes part of its ongoing care. Our annual maintenance packages cover commercial premises as well as homes.
Planning a club or community-building refit?
We can discuss heating and cooling alongside the other requirements for your premises. Call or WhatsApp Lee on 07973 131434 to talk through air conditioning for your project.














